Site measure
Book a measure at a time the room is actually free
Most openings need eyes on them before anyone can quote honestly. Tell us when the room is free, whether that is before opening, between bookings or during term break, and we work around it.
What happens on site
Half an hour, and the quote stops being a guess

We measure the structural opening
Width, height, square, floor level and the head condition. We measure the opening it has to live in, not the door that is there now.
We check what limits the job
Stack space, ceiling void, head fixing and access. This is where the surprises live, and finding them now is the whole point.
You get a written quote
Itemised, with anything that has to be done by your builder listed separately so nobody assumes it is in our scope.
Have ready if you can
- Who on site can let us into the room
- Any site induction we need to complete first
- Whether the ceiling is accessible above the opening
- Drawings, if the project has them
